Technology
Cairns looks to next-gen broadband upgrades as data hunger surges
Faster fibre and low-earth orbit satellite plans are on the roadmap for the city's connectivity future.
How we reported this

Business and residential users in Cairns can expect a wave of broadband upgrades over the next two years as providers push fibre deeper into suburbs and prepare to launch new satellite services, according to industry sources familiar with the rollout plans.
The push comes as the city's data consumption climbs sharply, the Australian Competition and Consumer Commission reported national average monthly data usage hit 430 gigabytes per household in late 2025, up 18 percent year-on-year. Cairns, with its mix of remote workers, tourism operators and growing tech sector, is tracking above that national average, local internet exchange data shows.
Fibre-on-demand and full-fibre suburbs
NBN Co, the wholesale network operator, is expanding its Fibre-to-the-Premises (FTTP) upgrade program. Under the current "Fibre Connect" initiative, homes and businesses in suburbs such as Manoora, Manunda and Edge Hill can request a free upgrade to a full-fibre connection capable of 1 gigabit per second download speeds. The program, which began in 2023, has already passed more than 100,000 premises in the Cairns region, according to NBN Co's latest rollout data published in March 2026.
The next phase, expected to be formally announced before the end of 2026, will extend fibre availability to parts of Smithfield, Trinity Beach and Kewarra Beach. A NBN Co spokesperson confirmed the company is also trialling 2 Gbps services in select metro areas, though Cairns is not yet on that list.
Low-earth orbit and fixed wireless alternatives
Satellite internet is becoming a more serious contender for fringe suburbs and rural pockets. Starlink, operated by SpaceX, began offering its residential service in Australia in 2021 and now claims over 50,000 active subscribers in Queensland alone. In June 2026, the company launched a higher-capacity terminal for business users, called Starlink Flat High Performance, priced at A$1,390 for the hardware plus A$199 per month for the 1 TB priority data plan. The terminal is available for order in Cairns with delivery estimates of 2-4 weeks.
Tangerine Telecom, a smaller provider with a strong presence in Far North Queensland, this month announced plans to resell Starlink services bundled with its own fibre offerings, giving Cairns customers a single-bill option for both fixed and satellite connectivity. The bundled plans are due to go live in September 2026.
For areas where neither fibre nor satellite makes sense, fixed wireless is getting its own upgrade. NBN Co’s Fixed Wireless Plus product, launched in 2024, offers typical evening speeds of up to 100 Mbps for around A$80 per month wholesale, and coverage now reaches most of the Kuranda Range and parts of the Atherton Tablelands that previously relied on ageing copper.
The fly in the ointment remains cost for some. A basic 50 Mbps fibre plan in Cairns starts around A$75 per month, but the premium gigabit tiers run north of A$130, not including installation fees for new builds. Consumer advocacy group ACCAN has flagged that regional pricing still lags metro areas by roughly 15 percent on comparable speed tiers.
For residents and business owners watching their internet bills, the advice from local tech advisors is to check NBN Co's address lookup tool monthly, the free fibre upgrade window can open without much notice, and once a suburb is declared "ready to connect," the lead time for installation is typically 4 to 6 weeks.